Operating in a self-consumption with grid feed-in mode and supported by a 1 MWh energy storage system (under development), this project optimizes on-site energy use and enables a low-carbon upgrade, serving as the first local demonstration of an integrated clean energy system applied to a wastewater treatment facility.
| Application | Wastewater Treatment |
| Model & Capacity | - PV: N585 panel / 1.795MWp * Power generation/year: 1,884,750kWh * Carbon Reduction/year: 2,000 tons - BESS: 500kW/1,044kWh (4 * CP261L) |
| Solutions | • PV Power Station • Energy Storage Station • EMS |
Post time: Jun-11-2026