LSHE China European International Business School (CEIBS)
Project Name China European International Business School (CEIBS) Application Ghana capital, Africa PV Capacity 40.18kWp ESS Capacity 30kW/60kWh Diesel Generation 55KVA and 44KVA Cummins Application On-Off gridRead more -
LSHE Dubai Sewage Treatment Micro-grid Project
Project Name Micro-grid PV ,ESS and Genset for Sewage Treatment Project Location Sharjah ,Dubai ESS Capacity 100kW/200kWh 4sets Loads Average 80-90kW per day PV Capacity 404.74kWp Diesel Generation 200kWa Application Off-GridRead more -
LSH Machinery Intelligent Green Business Park
LSH Machinery Kunshan industrial Park conducted a full implementation of clean energy innovation through the integrated solution of PV power station, energy storage system and smart energy platform to achieve a yearly reduction of carbon emission by 1000 tons, equivalent of the park’s 40% municip...Read more -
LSH Park Till Mar.2022
Project Name LSH Park Till Mar.2022 Cumulative Solar PV installed capacity: 950kW Accumulative power generating capacity:3,674,471kwh Durable years:25years Payback Period :4.5~5years Cumulative reduction of CO2 emission:3663Tons ...Read more -
China Wuhu Fifth People Hospital Case
Project Name China Wuhu Fifth People Hospital distributed solar BESS & EV-charging project Application Self-consumption, Peak shaving and valley filling PV Capacity 441.45kWp BESS Capacity 1,935kWh/900kW (9x 100kW/215kWh BESS cabinet) EV Charger 960kW (8x 120kW) LSHE Offering PV ...Read more -
Gas Station
Project Name Gas station Texaco of LOS CAJUILES in The Dominican Republic Application PV Self- consumption, BESS as backup power and work when solar not work PV Capacity 47.3kWp BESS Capacity 57.6kWh/24kW LSHE Offering PV modules + BESS (4x RPI-B 6kw/14.4kWh)...Read more -
Mercedes Benz 4S Shop
Project Name Changsha Renfu Mercedes Benz 4S shop, China Application Self- consumption PV Capacity 164.045kW BESS Capacity 50kW/100kWh BESS cabinet LSHE Offering 1x BESS cabinet+ PV modules + Grid-connected cabinet + Cloud platform ...Read more -
Treatment Factory BESS Project
Project Name Treatment Factory BESS project, Zhejiang, China Application Peak Shifting and demand control BESS Capacity 3.01MWh Loads 33,000kWh/day(24hrs) ROI Period 3.50 Years Solution 14 sets 100kW/215kWh BESS cabinets +BESS grid-connected cabinet + Cloud platform EMS ...Read more -
Hangzhou Chemical Factory BESS Project
Project Name Hangzhou Chemical factory BESS project, China Application Peak Shifting BESS Capacity 8.20MWh Annual Charge/Discharge Around 4,500,000kwh Benefit Saving electric bill over RMB 1 Mil (around US$140,000) annually ROI Period 3.50 Years Solution 22x M372L BESS cabinets...Read more -
LSH Park Till Mar.2022
Project Name LSH Park Till Mar.2022 Cumulative Solar PV installed capacity: 950kW Accumulative power generating capacity:3,674,471kwh Durable years:25years Payback Period :4.5~5years Cumulative reduction of CO2 emission:3663Tons ...Read more -
LSH Business Park
Project Name LSH Business Park Application Peak-load shift Capacity 250kW/852kWh LSHE Offering 1 set 250kW/852kWh energy storage system (CATL battery cell),950kW PV station of roof topRead more -
LSHE Kunshan Green Low-Carbon intelligent Park
LSHE Kunshan Green Low-Carbon intelligent Park LSHE adheres to the concept of green, low-carbon and circular development. In 2017, Lei Shing Hong planned, designed and implemented the overall framework of the Kunshan headquarters park, empowering 100+ ofce/productio...Read more